Audit Area 6

Significant activity is underway at Mac Point as we progress with major excavation works near the corner of Evans Street and the Tasman Highway.

This specific area, previously part of the Hobart Gasworks, represents the final key zone requiring remediation on the Mac Point site. We will excavate approximately 12,000 cubic meters of material, effectively restoring the land to its natural ground level.

Summary of the ongoing works:

  • In-Situ Solidification: We are currently implementing a cutting-edge technique known as "in-situ solidification" to immobilize an estimated 1,100 cubic meters of tar-impacted material within the subsurface. This innovative approach ensures long-term protection of groundwater from the historical industrial use of the site.

 

  • Car Park and Red Square Enhancements: We are also undertaking improvements to the car park and Red Square, concurrently establishing a new a refurbished space for our edible precinct in the south-eastern corner of Mac Point. This will guarantee continued public access to these areas while maintaining a safe distance from the excavation and construction activities.

While we work to transform this area, please be aware of the increased activity on-site.

Temporary Closure to Evans Street Bus Layover Zones

Project Details:

  • Start Date: April 15th

  • Duration: Approximately 2 weeks

  • Impact: Bus layover zones on Evans Street inaccessible.

Scope of Work:

  • Dismantling of wall structure along Evans Street for Mac Point site excavation works.

Geotechnical Investigations at Mac Point

Project Details:

  • Start Date: April 15th

  • Duration: Approximately 4 weeks

  • Work Schedule: Monday - Saturday, 7:00 AM - 6:00 PM (weather permitting)

  • Noise Levels: Low to moderate

Scope of Work:

  • Underground Service Location: Precise mapping of subterranean utilities (pipes, wires) to prevent damage during future works.

  • Geotechnical Drilling: Extracting soil samples for analysis to determine composition and strength for safe and stable structure design.

  • Compaction Testing: Evaluating soil density and compaction characteristics to inform foundation and structure design suitable for the ground conditions.

UPCOMING EVENTS

After a four-year hiatus the Spiegeltent is returning to Hobart.

 

The show itself is a two-hour dazzling, decadent and Gatsbyesque cabaret full of surprises, with spectacular aerials and big dance numbers. The Spiegeltent will be located at Macquarie Point and accessed via Red Square.

 

EVENT DETAILS

  • Thursday 4 April 2024 - Sunday 5 May 2024

  • Access via Red Square

Tickets and more information

bottom of page